CASE STUDY – BRITISH STEEL SCUNTHORPE

Replacement Hydraulic Pipework Installation

CASE STUDY – IMTECH ENGINEERING

Chilled Water & LTHW Install in collaboration with Imtech

CASE STUDY – TATA STEEL PORT TALBOT

Hydraulic Pipework for Hydraulic Looper Lift

CASE STUDY – DAIRY CREST

Specialist Creamery Pipework Installation

CASE STUDY – BRIDGNORTH ALUMINIUM LTD

Building Services, Hydraulic and Pneumatic Pipework Services for Rolling Oil, Lubrication Oil and Cooling Water

CASE STUDY – OILGEAR TOWLER

Prefabrication and On-site Installation of High Pressure Hydraulic Pipework